Bellevue Transitional Kitchen

A large and very oddly laid out open kitchen (with a fantastic view of the lake) and 3 cramped bathrooms were in desperate need of updating to maximize storage and bring the spaces up to date for this busy young family.  Both homeowners were very involved in the design process and we worked well as a team coming up with a transitional design for each space with a splash of color and durable finishes.  The General Contractor had to be let go (mid-project) and replaced with another team who would listen to directions and follow the plans.  The family had already moved out with their 2 children while the asbestos in the ceilings was removed.  The clock was ticking to finish the project!  In the end, it was well worth the wait; the homeowners were thrilled with the change of Contractor and can now enjoy each space to the fullest.